中部區域人工湖及伏流水初步評估檢討

計畫編號MOEAWRA1100371
英文計畫名稱Preliminary Assessment and Review of Artificial Lake and Hyporheic Flow in Central Region
計畫主類別輔助行政
主辦人員機關水利規劃試驗所
主辦人員單位水資源規劃課
契約開始日期2021/3/30
契約結束日期2021/12/15
契約經費資本門0
契約經費經常門2,720,000
中文計畫摘要因應氣候變遷影響中區水資源未來可能缺水疑慮,先行檢討評估區域可供利用水資源,增加枯水期水資源調配,及提昇區域供水系統之備援能力。
英文計畫摘要In recent years, climate change has widely effects, including shifting in precipitation patterns and increasing in the frequency of flooding and droughts on Taiwan, especially central region (Miaoli County, Taichung City, Nantou County, Changhua County and Yunlin County). Accordingly, stable water supply and potential of emergency water supply are the most important issues of water resource in central region. To increase the utilization and ability of water supply in central region, the plans of artificial lake and hyporheic flow should be reviewed and evaluated. Geological condition, source of water, water quality, environmental impact and economic benefit are the important factors in assessment of artificial lake and hyporheic flow. There are 7 main rivers which are Jhonggang River, Houlung River, Da-an River, Dajia River, Wu River, Jhuoshuei River and Beigang River in central region. Besides Jhonggang River and Houlung River, the preliminary assessments of artificial lake have been completed. In addition to Jhonggang River and n Beigang River, the preliminary assessments of hyporheic flow have been finished. Furthermore, the new preliminary plans of artificial lake and hyporheic flow for each river have been evaluated in this project based on previous plans of water resource and hydraulic facilities in central region. Following the result of preliminary assessments in this project, the water supply capability is 5 to 33 thousand CMD for artificial lake and 15 to 60 thousand CMD for hyporheic flow. Considering feasibility and urgency, the priority of hyporheic flow is higher than artificial lake. Therefore, all the plans of hyporheic flow have to be further evaluated according to water demand of each area.
年度項目1.各流域基本資料蒐集及區域背景特性彙整分析 2.各流域水資源及供水系統分析檢討 3.水質、地質及土地利用補充調查分析 4.方案研擬評估(可能性及必要性)及設置功能探討 5.供水潛能調查評估分析 6.工程初步規劃檢討及工程費估算 7.民意初步調查及環境與生態影響初步分析評估 8.綜合評估與建議
受委託機構中興工程顧問股份有限公司
主持人姓名鍾文祥
中文關鍵字人工湖, 伏流水, 水資源利用
英文關鍵字Artificial Lake, Hyporheic Flow, Water Resource Utilization
計畫研究成果1、完成中部區域7大流域基本資料蒐集、區域背景特性彙整分析與水資源及供水系統分析檢討 2、完成中部區域人工湖與伏流水方案研擬評估(可能性及必要性)及設置功能探討 3、完成中部區域水質、地質及土地利用補充調查分析 4、完成後龍溪與濁水溪流域抽水試驗及水質試驗。 5、完成中部區域人工湖與伏流水方案之供水潛能調查評估分析 6、完成各方案工程初步規劃檢討及工程費估算 7、完成民意初步調查及民眾權益評估 8、完成環境與生態影響初步分析評估
應用情形及效益本計畫初步依據既有地下水位、水質、前期規劃報告、補充調查與各水系水資源利用情況,於中部區域7大河系中分別提出可能之人工湖及伏流水方案;中港溪(三灣人工湖與伏流水)、後龍溪(公館人工湖與伏流水)、大甲溪(東勢人工湖與石岡壩上游伏流水)、烏溪(鳥嘴潭後池人工湖與快官、福田、烏溪橋伏流水)、濁水溪(二水人工湖與溪州、西螺、集集伏流水)以及北港溪(虎尾人工湖);以作為因應氣候變遷與地方產業發展之需求,並強化中部區域枯旱期間之水資源調度與操作,以提升區域供水系統之備援能力。